Slope Stabilization Program
A 2.4-kilometre corridor of high-risk rock cuts required investigation, kinematic assessment, and a package of bolting, draped mesh, and drainage that could be installed on steep, active faces.
We stayed through construction so as-built structure and unforeseen wedges were folded back into the design rather than left as extras.